How long does self-leveling compound take to cure?
Short answer
walk in 4-6 h, full 24-72 h
Self-leveling compound is walkable in 4-6 hours and ready for flooring in 24-72 hours.
What changes the time
| Condition | Time | Why |
|---|---|---|
| in a cold room | much longer | Low temperatures slow the cure. |
| for a thick pour | up to 7 days before flooring | Deep layers need more time. |
Tips
- Do not install flooring until it is fully cured to avoid trapped moisture.
FAQ
How soon can I walk on self-leveler?
Usually 4-6 hours for light foot traffic.